Resources / Continuous improvement glossary
Glossary
Continuous improvement glossary
The terms of Lean and Six Sigma, each defined in one sentence, with a link to the full guide where there is one.
- 5S
- A method to organise a workplace in five steps: sort, set in order, shine, standardise and sustain.
- 5 Whys
- A root-cause technique that asks “why?” repeatedly until it reaches a cause a concrete action can remove. Read the guide →
- A3
- A way of solving a problem on a single A3 sheet, from background and current state to root cause, countermeasures and follow-up. Read the guide →
- Control plan
- The document that keeps an improvement in place: which step to watch, with which metric and limits, how often, who acts and what they do if it drifts. Read the guide →
- DMAIC
- The Six Sigma method for improving an existing process in five phases: Define, Measure, Analyse, Improve and Control.
- Gemba
- The place where the work is done; “going to the gemba” means observing the process there rather than from reports.
- Ishikawa diagram
- A fishbone-shaped diagram that groups the possible causes of a problem into categories such as method, manpower, machine and material. Read the guide →
- Kaizen
- Continuous improvement through small, frequent changes; a kaizen event is a focused workshop of a few days on one process. Read the guide →
- KPI
- Key performance indicator: the metric that shows whether a process or project is reaching its goal. Read the guide →
- Lead time
- The total time from the moment a request enters a process to the moment it leaves, waiting included.
- Lean
- A way of managing work that increases value for the customer by removing waste from the process.
- Muda (waste)
- Any activity that consumes resources without adding value for the customer; Lean names eight kinds. Read the guide →
- Pareto chart
- A bar chart that ranks causes from most to least frequent, to show the few that account for most of the effect. Read the guide →
- PCE (process cycle efficiency)
- The share of the lead time spent on work that adds value: value-adding time divided by lead time.
- PDCA
- The improvement cycle Plan, Do, Check, Act, repeated to test a change and make it standard.
- Poka-yoke
- A simple device or design that makes a mistake impossible, or makes it visible at once.
- Project Charter
- The one-page document that launches an improvement project with its problem, goal, scope, team and milestones. Read the guide →
- Process time
- The time a step spends actually working on the unit, without waiting.
- SIPOC
- A one-page map of a process listing its suppliers, inputs, main steps, outputs and customers. Read the guide →
- Six Sigma
- An approach to improvement that reduces variation and defects in a process, using data and the DMAIC method.
- Takt time
- The pace at which a unit must be finished to meet customer demand: available time divided by demand.
- Value stream map (VSM)
- A map of every step of a process with its times, stock and waiting, used to see where the lead time goes. Read the guide →
- Voice of the customer (VOC)
- What customers say they need, turned into measurable requirements for the process. Read the guide →