Takt time is the pace at which one unit has to be finished to meet customer demand: available working time divided by the units demanded in that time. It is set by demand, not by the capacity of the process.

In minutes.

Planned breaks and meetings, in minutes.

Units per day.

In seconds. Used to compare the line with takt.

Calculated in your browser; nothing is sent or stored.

Takt time

60 s

Available time per day880 min
Slowest step vs takt108%

The slowest step takes longer than takt, so the line cannot meet demand at this pace without overtime or stock. Map the flow with a value stream map, remove waste from that step and rebalance the work across steps.

The formula

Available time = shifts × (shift length − breaks)
Takt time = available time ÷ customer demand
Load = slowest step cycle time ÷ takt time

Available time is in minutes and takt time is shown in seconds. Breaks are taken out because nothing is produced during them; unplanned stops are not, since takt describes demand, not what the line achieves.

Slowest step compared with takt

Cycle time vs taktWhat it means
Above 100%The line cannot meet demand at this pace
85% to 100%Demand is met with little margin
Below 85%Spare capacity, worth checking for waiting

Worked example

A line works 2 shifts of 480 minutes with 40 minutes of breaks each, giving 880 minutes a day. Customer demand is 880 units a day, so takt time is 880 × 60 ÷ 880 = 60 seconds. The slowest step takes 65 seconds, 108% of takt: that step cannot keep up with demand.

Related guides

Value stream map8 wastesKaizen

Frequently asked questions

What is the difference between takt time and cycle time?

Takt time is the pace demand requires; cycle time is how long a step actually takes. A step whose cycle time is longer than takt is a bottleneck for meeting demand.

Should breaks be subtracted from available time?

Yes, planned breaks and meetings come off, because no units are made then. Breakdowns and other unplanned stops stay in, since takt measures demand rather than performance.

What happens to takt time when demand changes?

It changes with it: more demand in the same time means a shorter takt. That is why takt is recalculated whenever demand or working hours change.

Sigma level and DPMO →OEE →

Run the whole project in one place

Charter, SIPOC, KPIs, causes, actions and control plan linked, with an AI copilot that drafts the first version.

Start free →

COOKIES

LeanOS uses cookies and browser storage to work.

We only store what the site needs: your sign-in, your language and your settings. With your permission we also use Google Analytics to see how the website is used; it stays off unless you turn it on. You can change your choice at any time under Cookie preferences. Cookie policy · Privacy policy